Difference between revisions of "ScanWay"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
# '''Alignment''': the group of functions that allow to integrate the scanning of different objects, or portions of objects, in order to accurately replicate their mutual position. | # '''Alignment''': the group of functions that allow to integrate the scanning of different objects, or portions of objects, in order to accurately replicate their mutual position. | ||
# '''Scan Edit''': tools that allow to delete the undesired parts of the images. | # '''Scan Edit''': tools that allow to delete the undesired parts of the images. | ||
− | # '''Mesh Generation''': the group of procedures and algorithms that transform the scans | + | # '''Mesh Generation''': the group of procedures and algorithms that transform the scans into triangle meshes that can be used with other CAD/CAM systems. |
− | # '''Mesh Edit''': tools for the elaboration of the meshes | + | # '''Mesh Edit''': tools for the elaboration of the meshes. |
<!--T:3--> | <!--T:3--> |
Revision as of 12:35, 24 April 2017
Open Technologies NeWay scanners use the ScanWay sofware to acquire and edit the images of the objects.
The application has been designed to perform the following operations:
- 3D optical scanning: the acquisition of the images of the scanned object.
- Alignment: the group of functions that allow to integrate the scanning of different objects, or portions of objects, in order to accurately replicate their mutual position.
- Scan Edit: tools that allow to delete the undesired parts of the images.
- Mesh Generation: the group of procedures and algorithms that transform the scans into triangle meshes that can be used with other CAD/CAM systems.
- Mesh Edit: tools for the elaboration of the meshes.
All information is logically organized within a Project. The scanning data addition or modification always takes place inside a Project, that can be saved or loaded from the disk.
The software supports two different kinds of projects:
- Free Projects: every element is independent from the other and the user can organise the logic of the project.
- Structured Projects: the elements are organised according to a Job Definition, established by the user or imported from another software.
Most of the considerations in this manual are valid for both project types.